Brooklyn Greenpoint
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-02651-0015), so they can include other buildings on the same lot.
5 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Apr 19, 2001 | B | NOV SENT OUT | 1R | SECTION 27-2026 ADM CODE REPAIR BY CLOSING SO AS TO BE GAS TIGHT ALL OPENINGS IN THE DRAIN PIPE UNDER SINK. IN THE BATHROOM LOCATED AT APT 1R, 1st STORY |
| Apr 19, 2001 | B | NOV SENT OUT | 1R | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH AND SOUTH WALLS. IN THE KITCHEN LOCATED AT APT 1R, 1st STORY |
| Apr 19, 2001 | A | NOV SENT OUT | 1R | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THROUGHOUT. IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY |
| Apr 19, 2001 | B | NOV SENT OUT | 1R | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE FLOOR. IN THE BATHROOM LOCATED AT APT 1R, 1st STORY |
| Jun 26, 1987 | A | NOV SENT OUT | Not available | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL 1 STY PUBLIC HALL. |