Brooklyn Borough Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION |
| Aug 18, 2010 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBTAIN PERMITS FOR WORK DONE 9IF FEASIBLE) OR OBTAIN PERMITS TO RESTO RE PROPERTY TO PRIOR LEGAL CONDITION |
| Oct 26, 2001 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: DEMOLITION OF 1ST AND 2ND FLOOR ALSO BUILDING BLOCK EXTENSION AT REAR OF BUILDING CAUSING WALL AT 2ND FLOOR TO BE FREESTANDING WITHOUT PROTECTION REMEDY: STOP ALL WORK FILE PLANS OBTAIN PERMIT CALL FOR ISPECTION AT (718) 802-3686 BEFORE WORK CONTINUE |
| Jul 10, 1999 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 21, 1999 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |