Brooklyn Clinton Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 7, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER REQ'D-OBSVD A SEVERLY HAZ CONDITION @ EXP1 @ PARAPET LEVEL NEAR EXP1/2 CORNER SUCH AS LOOSE/DISPLACED BRICKS WITH DETERIORATED MORTAR ALSON OBSVD SEVERAL MASONRY STEP CRACKS. IMMED PROVIDE SAFETY MEASURES TO SECURE/PROTECT PUBLIC @ EXP1, INSTALL S/W SHED @ FULL LENGTH OF EXP1 ON STEUVEN ST W/IN 24 HRS |
| Aug 7, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-@ EXP1 OBSVD LOOSE/DISPLACED MASONRY BRICKS 2 PARAPET LEVEL OF EXP1/2 CORNER. OBSVD SEVERAL MASONRY STEP CRACKS & DETERIORATED MORTAR JOINTS @ MULT LOCATIONS. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYC TO EVAL THE ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY SEPT 7 2025 |
| Aug 7, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 25 LINEAR FEET OF SIDEWALK SHED ALONG THE FULL WIDTH OF EXPOSURE 1 AT STEUBEN ST, AND APPROXIMATELY 5 FEET OVERLAP ONTO 110 STEUBEN ST, FOR A TOTAL OF 30 LINEAR FEET |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |