Jul 6, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STUCCO DETERIORATION/SPALLING PRESENT ON EXP4 DIRECTLY BELOW 3FL WINDOW OPENING & ADDITIONAL STUCCO SPALLING APPROX SEVERAL FEET TO THE LEFT OF 3FL WINDOW OPENING BOTH EXPOSING UNDERLYING BRICK MASONRY ON EXP4.OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG,PREPARE/FILE REPAIR DWGS,REPAIR BLDG UNDER PERMIT, START WORK BY SEPT 7 2026
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Jan 19, 2007 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Nov 6, 1989 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE P-PLUMBING NONE