Brooklyn Bedford-Stuyvesant (East)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
12 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 14, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.FEU OBSRVD 1WRK CONTRARY TO APPRVD DWGS,2.BLDG ROOF LEAKS&NOT PROPERLY WEATHRPROOF,3.SOME OF THE BLDG STRCTRE ELEMENTS WERE DAMAGED,ROTTED,&STRCTRLLY CMPRMSD IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343553(040524FEU30303ZT) TO REPAIR THE BUILDING UNDER PERMIT |
| Apr 5, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.FEU OBSRVD 1.WRK CONTRARY TO APPRVD DWGS,2.BLDG ROOF LEAKS,&NOT PROPERLY WEATHERPROOF,3.SOME OF TGE BLDG STRCTRE ELEMENTS WERE DAMAGED,ROTTED,&STRCTRLLY CMPRMSD.OWNR TO IMMED RTAIB NYSPE TO EVAL THE ENT BLDG,DETERMINE THE STRCTRL STABILITY&PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRD PRMT STRTNG4/22/24 |
| Apr 5, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.1STORY&PARTIAL CELLAR DETACHD MASONRY WALLS W/STEEL TROSSES&WOOD JOISTS COMMERCIAL BLDG THAT SUSTAIND SEVERE STRCTRL DAMAGE DUE TO FIRE ON 4/7/24.ROOF PRTLLY CLLSPD.EXTERIOR WALLS.IMMED FULLY DEMO BLDG UNDR DRCT&CNTINUOUS SUPERVISION OF PE SUBMT MEANS& METHODS TO FEU BY 4/1/24.COORDINATE DEMO W/FDNY |
| Apr 3, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.FEU OBSRVD THE EXP WAS BULGD OUTWARD THE WINDOW FRAME HAD DISLODGED,LEANED INWARD&DEEMED UNSTABLE.BRICKS WERE MISSING ON THE INTERIOR WYTHE,LEAVNG EXP1WYTHE.OWNR TO INSTALL SIDEWALK SHED ON EXP1,FULL WIDTH |
| Nov 14, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | A 3 STORY NFP BLDG WITH EXTERIOR WALLS ON EXP 1, 3 & 4 SIDES HAS STRUC TRUAL CRACKS. EXP 4 SIDE WALL IS SEVERELY DETERIORATED & LEANING SLIGH TLY TO THE RIGHT. A SECTION OF 2ND & 3RD FL HAS BEEN CUT & IMPROPERLY SHORED & BRACED; LACKING SAFETY MEASURES. NO PERMIT HAS BEEN FILED WIT H DOB FOR FULL GUT RENOVATION |
| Feb 16, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 5, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 27, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 18, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 23, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 14, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 23, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |