Brooklyn East Flatbush-Remsen Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Oct 24, 2022 | V*-DOB VIOLATION - DISMISSED | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Jul 8, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. FIRE HAS CAUSED EXTENSIVE FIRE,SMOKE AND WATER DAMAGE THROUGHOUT. FINISHED WALLS REMOVED, WINDOWS OUT, ROOF OPEN. |
| Nov 26, 1997 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | ES-ELECTRIC SIGNS NONE | NO SIGN PERMIT FOR NON-ILLUMINATED SIGN AND CANVAS AWNING INSTALLED PARALLEL TO THE FIRST STORY FRONT FACADE WITH WORDING:JACKIES FABRIC AND BOUTIQUE NOTIONS AND TRIMMINGS 756-4660,1056. APPROX 20FT LONG AND 4FT HIGH OBTAIN A NON-ILUMINATED SIGN PERMIT IF FEASIBLE OR RESTORE PREMISES |
| Nov 26, 1997 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 24, 1997 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |