Brooklyn Crown Heights (North)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-01216-0003), so they can include other buildings on the same lot.
520 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Aug 25, 2026 | B | VIOLATION CLOSED | 2L | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 25, 2026 | B | VIOLATION CLOSED | 2L | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 25, 2026 | B | VIOLATION CLOSED | 2L | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSE ELECTRICAL WIREING AT WEST WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Mar 15, 2026 | C | VIOLATION CLOSED | 3L | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Mar 15, 2026 | B | VIOLATION CLOSED | 3L | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Mar 15, 2026 | B | VIOLATION CLOSED | 3L | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Mar 15, 2026 | C | VIOLATION CLOSED | 3L | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 18, 2025 | C | VIOLATION CLOSED | 3L | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 18, 2025 | C | VIOLATION CLOSED | 3L | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 18, 2025 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED LEADING TO BASEMENT. AT PUBLIC HALL, 1st STORY |
| Dec 18, 2025 | C | VIOLATION CLOSED | 2L | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 18, 2025 | C | VIOLATION CLOSED | 2L | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 14, 2025 | C | VIOLATION CLOSED | 2L | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 14, 2025 | C | VIOLATION CLOSED | 2L | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 14, 2025 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM |
| Dec 14, 2025 | C | VIOLATION CLOSED | 3L | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 14, 2025 | C | VIOLATION CLOSED | 3L | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 19, 2025 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Jun 25, 2024 | B | NOT COMPLIED WITH | Not available | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRES AT CEILING AT CELLAR |
| Jun 25, 2024 | B | NOT COMPLIED WITH | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT CELLAR |
| Jan 29, 2024 | A | VIOLATION CLOSED | 2R | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 29, 2024 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 4th STORY |
| Jan 29, 2024 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AT PUBLIC HALL, 4th STORY |
| Jan 29, 2024 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 4th STORY |
| Jan 29, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE |
| Jan 29, 2024 | C | VIOLATION CLOSED | 2R | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET , IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 29, 2024 | B | VIOLATION CLOSED | 2R | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE UNDER SINK AT CABINET IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 29, 2024 | C | VIOLATION CLOSED | 4L | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AIR VALVE FOR RADIATOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 29, 2024 | C | VIOLATION CLOSED | 2R | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 8, WG TO REPLACE = 0, WG TO REPAIR = 1 IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 29, 2024 | B | VIOLATION CLOSED | 2R | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 29, 2024 | B | VIOLATION CLOSED | 2R | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 29, 2024 | B | VIOLATION CLOSED | 2R | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 29, 2024 | B | VIOLATION CLOSED | 2R | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 29, 2024 | C | VIOLATION CLOSED | 2R | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 22, 2024 | B | VIOLATION CLOSED | 4L | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 22, 2024 | A | VIOLATION CLOSED | 4L | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 21, 2023 | C | VIOLATION CLOSED | 3L | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 14, 2023 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY |
| Nov 14, 2023 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT THE CEILING AT PUBLIC HALL, 4th STORY |
| Nov 14, 2023 | C | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 4th STORY |
| Nov 14, 2023 | C | VIOLATION CLOSED | 3R | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 14, 2023 | B | VIOLATION CLOSED | 3R | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 14, 2023 | B | VIOLATION CLOSED | 3R | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 14, 2023 | C | VIOLATION CLOSED | 3R | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 14, 2023 | C | VIOLATION CLOSED | 3R | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3R, 3rd STORY, APARTMENT AT SOUTH |
| Oct 19, 2023 | B | VIOLATION CLOSED | 4L | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4L, 4th STORY, APARTMENT AT NORTH |
| Oct 19, 2023 | A | VIOLATION CLOSED | 4L | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH AND WEST WALL IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 19, 2023 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Oct 19, 2023 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERATIVE BELL AND RETURN BUZZER FROM VESTIBULE TO APT # 4L AT PUBLIC HALL, 1st STORY |
| Oct 5, 2023 | A | VIOLATION CLOSED | Not available | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY |