Brooklyn Borough Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 15, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | SUBMIT ENGINERR'S REPORT W/PHOTOS PROBES ETC. SIGN SEALED BY NYS P.E.E VALUATING EXP-1 PARAPET WALL & STABILITY (FORENSIC ENG@BUILDINGS.NYC GOV |
| Mar 22, 2000 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: PARTITIONS ERECTED AT BASEMENT LEVEL CREATING ROOMS AND ARRANGE TO BE OCCUPIED WITH BATHROOM, TOILET SINK, SHOWER, KITCHEN SPACE, GAS STOVE, SINK, CABINET, REFRIGERATOR, OBSERVED. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RETURN PREMISES TO PRIOR LEGAL CONDITION |
| Mar 8, 2000 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT. WORK NOTED: THE FRONT YARD HAS BEEN EXCAVATED AND A CONCRETE PAD INSTALLED TO PARK CARS. THE APPROX AREA 13FT BY 20FT REMEDY: OBTAIN PERMITS IF FEASIBLE OR RETURN TO LEGAL CONDITION |