Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 14, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG IS A DETACHED WAREHOUSE,APPRX 75'W X 100'D ON AN INTERIOR LOT APPRX SAME SIZE.THE BLDG WAS FULLY VACATED ON 10/23/23.FEU OBSRVD THE EXP1 HAD.IMMED COMPLY WITH COMMISSIONER'S ORDER 343703 (051424FEU30306ZT)TO REPAIR THE BUILDING UNDER PERMIT |
| May 14, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG A DETACHED WAREHOUSE,APPRX 75'W X 100'D ON AN INTERIOR LOT APPRX SAME SIZE.THE BLDG WAS FULLY VACATED ON 10/23/23.FEU OBSRVD THE EXP1 HAD NUMEROUS CRCKS&SOME OF THE WNDW LINTEL&SILL WERE DETERIORATED.OWNR TO RTAIN NYS PE TO EVAL ENT BLDG,DET THE STRCTRL STBILITY&PREPARE/FILE RPAIR DWGS |
| Oct 23, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. FULL VACATE ISSUED FOR EXPOSURE#3 1ST AND 2ND FLOOR. DUE TO WATER DAMAGE CAUSING ROOF TO PARTIALLY COLLAPSE. FEU TO FOLLOW UP AND PLUMBING UNIT CAUSE OF DISLODGED SPRINKLER PIPE. |