Brooklyn Ocean Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 13, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL REQUIRED OPENING TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Sep 18, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL BUILDING AND ALL ACCESSIBLE OPENINGS |
| Sep 17, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING : AT TIME OF INSPECTION OBSERVED A DEFECTIVE FRONT STOOP OF 103 HULL ST CONCRETE IS CRACKED IN SEVERAL LOCATIONS CAUSING A COMPROMISED EGRESS AND A OVERHEAD HAZARD THE CELLAR ENTRANCE |
| Mar 4, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSRVD EXP2 INDEPENDENT WALL BULGD@1STFL LVL APPRX15'LENGTH PARTIAL CLLPSE OF BRCK NOGGINS WOOD STUDS&SHEATHNG HEAVILY WATER DMGD&TERMITE EATEN@BULGE AREA.SHEATHNG DTACHD FRM WOOD STUDS&SHEATHNG.COMPLY WITH COMMISSIONER'S ORDER DOB VIOLATION #012424FEU31601AK(CONTROL #343344) IMMEDIATELY |
| Jan 29, 2024 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jan 24, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSRVD EXP2 INDEPENDENT WALL BULGD@1STFL LVL APPRX15'LENGTH PARTIAL CLLPSE OF BRCK NOGGINS WOOD STUDS&SHEATHNG HEAVILY WATER DMGD&TERMITE EATEN@BULGE AREA.SHEATHNG DTACHD FRM WOOD STUDS&SHEATHNG.OWNR TO ENGGE NYS PE&ENDRSD CNTRCTR TO EVAL ENT BLDG&PREPARE PLANS FOR RPAIR.FILE PLANS FOR RPAIR BY 3/1/24.STRT WRK BY 5/1 |
| Jan 24, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL TWO LINES OF SHORING WITH CROSS BRACING IN BOTH DIRECTIONS ALO NG ENTIRE EXPOSURE 2 WALL, FROM CELLAR TO ROOF |
| Oct 19, 1999 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED AT CELLAR FRONT 3 PC. BATHROOM REMEDY: OBTAIN PERMIT FOR SHOWR OR REMOVE |