Date Status Type Summary
Oct 22, 2026 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY- REMOVE APPROX. 50 LINEAR FEET OF THE EXISTING NON-COMPLIANT FENCE AND REPLACE IT WITH A CODE COMPLIANT CONSTRUCTION FENCE. FENCE TO BE REPLACED AT CURRENT LOCATION, FULL LOT WIDTH AT EXPOSURE 1, 20-FEET, PLUS TWO 15-FOOT END RETURNS ALONG THE EXPOSURE 2 AND 4 LOT LINES. TOTAL 50 LINEAR FENCE
Mar 28, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ADDITIONAL INFORMATION.SHORED&BRACED UNDR IED 18028 PEREOR'S APPRVD MEANS&METHODS ON SK-01 THRU SK-06 DATED 1/19/24 W/FEU COMMENTS DATED 1/20/24.DAILY REPORTS BY EOR WERE REQ'D TO BE SUBMITTD.IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER #343434 (032124FEU30201PN)DATED MARCH 21,2024.SUBMIT OUTSTANDNG PRO
Mar 21, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ADDITIONAL INFORMATION.SHORED&BRACED UNDR IED 18028 PEREOR'S APPRVD MEANS&METHODS ON SK-01 THRU SK-06 DATED1/19/24 W/FEUCOMMENTS DATED 1/20/24.DAILY RPORTS BY EOR WERE REQ'D TO BE SUBMTTD.OF AL S&S DAILY DAILY RPORTS WHEN WRK TOOK PLACE
Feb 2, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WEATHRPRF INTEGRITY OF ADJOINGING BLDGS.BLDG UNDR ADDTNL SHORNG BY OWNERS PE W/DAILY RPORTS SUBMITTD TO FEU.BLDG VISIBLY LEANING TOWARDS EXP2&VACANT LOT@104 RYERSON STREET EVIDENCED BTY VERT CRCK.OWNR TO RTAIN NYSPE&GC REQ W/DOB TO IMMED WEATHERPRF ADJ 100 RYERSON ST BLDG PER BC 3309.WHERE WEATHERPRF INTEGRITY
Feb 2, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ADDITIONAL INFO/MONITORNG.EXP2WALL PREV REMVD@1STFL TO ROOF & INADEQUATELY TEMPORARILY SHORED&INADEQUATELY WEATHERPRFD W/TARP BLDG UNDR ADDTNL SHORNG BY OWNRS IS PE W/DAILY RPORT SUBMITTD TO FEU.OWNR TO RTAIN LICENSD MONITORNG COMPANY/NYS PE TO INSTALL OPTICAL MONITORNG @EXP1,2,3&CRCK MONITORNG@EXP1 CRCKS@102 RYE
Feb 2, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EXP2 WALL PREVIOUSLY REMOVED@1STFL TO ROOF W/TEMP/INADEQUATE SHORNG BLDG UNDR ADDTNL SHORNG BY OWNER'S PE UNDR HOLD ON IED#18028 PER PE DAILY RPORTS SUBMITTD TO DOB BTWN 1/23/24 & 2/2/24.COMPLY WITH CODE FILE DWGS TO LEGALIZE ALL WRK TO MATCH EXISTNG CONDITIONS.OBTAIN PRMT IMMEDIATELY
Dec 19, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL EXTEND/REINFORCE EXISTING SHORING OR INSTALL NEW LINE OF SHORING TO PROVIDE CONTINUOUS SHORING ALONG FULL BLDG DEPTH W/ SHORING DIRECTLY IN LINE VERTICALLY. INSTALL A MIN OF 1 ADD SHORING LINE FULL HT FROM CELLAR TO ROOF & FULL BLDG DEPTH W/ LATERAL CROSS BRACING TYING THE(2) SHORING LINES TOGS. SPACE SHORING LINES MIN 4 FT HORIZ. TIE BACK EXP 1
Dec 13, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B08024318 ON 12/12/23 SUSPENSION OF PERMIT, INTENT TO REVOKE.
Dec 11, 2023 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE FULLY DEMOLISH THE BUILDING. GRADE AND FENCE SITE
Dec 11, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMMEDIATELY INSTALL A MINIMUM 1 LINE OF SHORING NEAR THE CENTER OF THE BLDG FOR THE FULL HEIGHT FROM CEL. TO UNDERSIDE OF ROOF&FULL BLDG DEPTH W/LATERAL CROSS BRACING TYING THE EXISTING SHORING TO THE NEW CENTER LINE SHORING. NEW SHORING TO BE SPACED MINI 6TH HORIZONTALLY FROM EXISTING SHORING LINES. TIE BACK EXP.1&2 TO BACK TO STRUCTURE
Aug 4, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ADDITIONAL INFORMATION:3STORY+B WOOD FRAME W/EXP1&2 WALLREPAIRS ONGOING UNDER PERMIT ##B08024318-I10GC.SPECIAL INSPECTOR ISBRIAN FLYNN PE.WORK HAS BEEN ONGOING UNDER MULT SWO'S PER DOB INSP.SPECIAL INSPCTR OF OF RECRD, BRIAN FLYNN, PE SHALL PRVDE ALL INSPCTN DATES&SGND&SEALED INSPECTN RPORTS W/PHOTOS SUMMARIZNG
Aug 1, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL UNLAWFULLY CONTINUED OF WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION, APPROXIMATELY 4 CONSTRUCTION WORKERS PERFORMING WORK AND/OR ERECTING CMU MASONRY WALL AT EXPOSURE #2, AND OTHER MISCELLANEOUS WORKS, CONTRARY TO STOP WORK ORDER #039058769Y.
Aug 1, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL UNLAWFULLY CONTINUED OF WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION, APPROXIMATELY 4 CONSTRUCTION WORKERS PERFORMING WORK AND/OR ERECTING CMU MASONRY WALL AT EXPOSURE #2, AND OTHER MISCELLANEOUS WORKS, CONTRARY TO STOP WORK ORDER #039058769Y.
Jan 6, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMER WORK ORDER.EXP2 WALL BULGING OUT&COMPROMISED.EXP1 WALL CRCKD W/ STUCCO SPALLING.BLDG TEMP SHORED @ INTERIOR&AT FRONT YARD W/DIAGNL BRACES.FRNT YRD OPEN&A DANGER TO THE PUBLIC.OWNR TO RETAIN GC REG W/ DOB TO INSTALL TIGHT BOARD FENCE TO SECURE FRNT YARD.START WRK BY 1/9/23 & CONT WORK DAILY
Jan 3, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. ST TIME OF INSPECTION IT WAS OBSERVED THAT THE EXPOSURE 2 EXTERIOR STUCCO WALL WAS IN A STATE OF DISREPAIR WITH BULGING AND MULTIPLE STRUCTURAL CRACKS, ALONG WITH BULGING AND CRACKING OF THE EXPOSURE 1 FACADE
Mar 16, 2022 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 9, 2022 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMMEDIATELY INSTALL A MIN OF TWO LINES OF SHORING WITH LATERAL.CROSS BRACING BETWEEN THE 2 LINES ALONG THE FULL LENGTH OF THE EXP 2 WALLS & EXTENDING THE FULL HEIGHT OFTHE BUILDING FROM CELLAR SLAB TO UNDERSIDE OF THE ROOF JOISTS. TIE JOISTS TO EXP 2 WALL AT 1ST,2ND, 3RD, AND ROOF LEVELS. SHORING AND BRACING TO BE DESIGNED BY A NYS PE
Mar 9, 2022 V-DOB VIOLATION - ACTIVE UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Feb 28, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG IN A SAFE CONDITION. 102 RYERSON ST BLDG HAS THE FOLLOWING DAMAGE-VERT CRACK AT EXP 1/2 CORNER FROM GRADE UP TO 1FL WINDOW LEVEL, HORIZONTAL CRACK AT EXP 1 STUCCO ALONG 1FL, HORIZONTAL CRACK & BULGE AT EXP 2 WALL ALONG 2FL LEVEL. REMEDY: OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG & PREPARE/FILE REPAIR DWGS. REPAIR UNDER PERMIT BY 3/14/22
Feb 25, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL AT EXPOSURE #2 FACADE WALL IN DISREPAIR CONDITION BULGING AND HAS VERTICAL CRACK. AT THE CORNER OF EXPOSURE 1 FACADE WALL BULGING AND HAS VERTICAL CRACK.
Jan 14, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. BUILDING LOBBY INTERIOR WALL AT EXPOSURE # 2 IN SEVERE STATE OF DISREPAIR WITH DEFLECTION, MULTIPLE CRACKS, MISSING PLASTER AND EXPOSED BRICK.
Apr 29, 1992 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL