Brooklyn Downtown Brooklyn-DUMBO-Boerum Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 15, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 15, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 26, 2011 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK MAKE SITE SAFE CONTACT DOB |
| May 17, 2001 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: PARTITIONS CONSTRUCTED AT BASEMENT CREATED 2 SINGLE ROOMS, KITCHEN WITH GAS STOVE AND BATHROOM. KITCHEN REMOVED AT 2ND ROOM FROM REAR AT 3RD STORY AND CONSTRUCTED AT 3RD STORY REAR ROOM WITH GAS STOVE- POLE SCAFFOLD CONSTRUCTED AT REAR WALL HUNG CEILING CONSTRUCTED AT HALLWAY. REMEDY: OBTAIN A PERMIT FORTHWITH |
| May 17, 2001 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 17, 2001 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | HAZARDOUS |