Brooklyn Park Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 21, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITD ALTERATION LEFT BLDG STRUCTRLY COMPRMSD,SIGNIFCANT CRACKNG IN EXP#3WALL,FLRS NOT ANCHORD TO WALLS, DEBRIS PILES,UNBRACED CMU WALL IN REAR YARD. REMEDY: COMPLY W CODE,RETAIN NYS RDP FOR STRUCTRL STABILTY INSPECTN & RPTS 1 PER/WEEK, 1ST RPT BY 9/29/23 W PHOTOS OF ALL FLRS |
| Sep 21, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITD ALTERATION LEFT BLDG STRUCTLY COMPROMSD,SIGNIFCANT CRACKNG IN EXP#3 WALL,FLRS NOT ANCHORED TO WALLS, DEBRIS PILES, UNBRACED CMU WALLS IN REAR YARD. REMEDY: RETAIN NYS RDP2STABILZE,SECURE&PROTECT.SITE,ADJ PROPS&PUBLIC.FILE DWGS BY 9/29/23.COMMENCE UNDR PERMIT BY 10/13/23 |
| Sep 19, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER . NOTED : OBSERVED ON THE FIRST FLOOR ONE OF THE WALL AT REAR HAS CRACKS THROUGH OUT,ALSO THE IS FULL GUT DEMOLITION/ RENOVATION IS GOING THROUGHOUT, WITH REMOVAL OF PLUMBING/ELECTRICAL, ALSO FLOOR JOIST IS BEING REMOVED, AND REPLACED . THERE IS NO JOB FILING IN DOB NOW, OR BIS. |
| Sep 19, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. NOTED : OBSERVED FULL GUT RENOVATION THROUGHOUT THE BUILDING, WITH REMOVAL OF PLUMBING, AND ELECTRICAL LINES,ALSO FLOOR JOIST HAS BEEN REMOVED AND REPLACED. AT THE REAR THEY ARE BUILDING A DECK AND FENCE WITH CMU BLOCKS. THE JOB IS 30 PERCENT COMPLETE. |
| Aug 27, 2001 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | HAZARDOUS |
| Aug 27, 2001 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | HAZARDOUS |