| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION |
| Oct 30, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION |
| Feb 22, 2024 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| Dec 13, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 13, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 13, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 13, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 13, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 13, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 13, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 1, 2019 | V*-DOB VIOLATION - DISMISSED | RWNRF-RETAINING WALL NONE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 |
| Oct 1, 2019 | V-DOB VIOLATION - ACTIVE | RWNRF-RETAINING WALL NONE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO PRIV RES ELEVATOR-FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TEST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TEST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TEST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TEST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TEST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACJ1-(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Apr 5, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2017 INSP/TEST |
| Apr 5, 2019 | V-DOB VIOLATION - ACTIVE | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST |
| Dec 5, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 5, 2018 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 5, 2018 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 11, 2018 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 26, 2018 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TEST |
| Jan 26, 2018 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TEST |
| Jan 26, 2018 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TEST |
| Jan 26, 2018 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TEST |
| Jan 26, 2018 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |