Bronx Wakefield-Woodlawn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 18, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 27, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM DUE TO FIRE OCCURRED ON 8/25/15 THE BLDG HAS THE ROOF PARTIALLY COLLAPSED REAR WALL ABOVE 2ND FL IS FIRE DAMAGED & PARTIALLY COLLAPSED 2ND FL JOIST @ REAR OF PREMISES ARE EXPOSED & FIRE CHARRED FOR AN AREA OF APPROX 6'X12'W. OWNER TO ENGAGE NYSPE ENGINEER & ENDORSED CONTRACT TO EVAL THE WHOLE BLDG.PROVIDE PLANS&PERMITS/DEMO NO LTR THAN 9/10/15 |
| Aug 27, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM DUE T/A FIRE OCCURRED ON 8/25/15 THE BLDG HAS THE ROOF PARTIALLY COLLAPSED. REAR WALL ABOVE 2ND FL IS FIRE DAMAGED & PARTIALLY COLLAPSED 2ND FL JOIST @ REAR OF PREMISES ARE SEDPOSED @ FIRE CHARRED OWNER TO IMMED ENGAGE AN ENDORSED CONTRACTOR TO ERECT A TIGHT BOARD CONTRUCT FENCE. SUBMIT FOR PERMITS W/IN 48HRS IF COMMENCEMENT OF WORK |
| Aug 25, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |