Bronx Allerton
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 15, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: INSTALL APPROXIMATELY 32 FT OF SIDEWALK SHED AT EXPOSURE #1 ND EXTEND 5 FT CATCHALL AT BOTH ENDS FOR A TOTAL OF APPROX 42FT TO SAFEGUARD THE PUBLIC |
| Oct 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING ENGINEERS REPORT DUE TO EXPOSURE #1 BETWEEN THE 2ND AND 3RD FLOORS, MULTIPLE STEP CRACKS AND A BULGING SECTION OF THE FACADE, WITH DETERIORATED MASONRY THAT MAY BECOME LOOSE AND POSE A POTENTIAL HAZARD TO THE PUBLIC BELOW. |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Mar 26, 2002 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 2, 1990 | VP-VIOLATION UNSERVED ECB-ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |