Bronx Eastchester-Edenwald-Baychester
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
17 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.BLDG WAS DAMAGED BY FIRE ON 5/21/24.OPEN ROOF CHARRED JOISTS.COLLAPSED CEILINGS WATER DAMAGE.OWNR TO ENGAGE NYSPE & REG CNTRCTR TO RPAIR THE BLDG UNDR PRMT BY 7/20/24.COMPLETE BY 9/20/24 |
| Jun 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.CHARRD JOISRS@ROOF,2NDFL @REAR.WATER DAMAFE OPEN ROOF.MISSING WINDOWS.OWNR TO ENGAGE NYSPOE® CNTRCTR TO RPAIR THE BLDG UNDR PRMT BT 7/13/24.COMPLETE BY 9/13/24 |
| May 21, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED ENTIRE STORES THROUGHOUT DUE TO FIRE AT 981 EAST 233 STREET BRONX. A FULL VACATE ISSUED AND SUBMIT ENGINEER'S REPORT. |
| May 21, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLAINT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED ENTIRE BUILDING DUE TO FIRE AT 4013 GUNTHER AVE BRONX. A FULL VACATE ORDER ISSUED. |
| May 21, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FIRE DAMAGE THROUGHOUT ALL STORES AND ADJACENT 2-FAMILY DWELLING BUILDING WITH CHARRED WOOD JOISTS, BURNT-OUT PARTITION WALLS, CEILING AND WATER-PILED DEBRIS. EGRESS COMPROMISED WITH FIRE RELATED DEBRIS. ALSO STORES ROOF STRUCTURAL STABILITY COMPROMISED DUE TO FIRE. |
| May 21, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED ENTIRE STORE DUE TO FIRE AT 987 EAST 233 STREET BRONX. A FULL VACATE ORDER ISSUED. |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Dec 20, 2017 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 4, 1990 | V*-DOB VIOLATION - DISMISSED | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |
| Sep 4, 1990 | V*-DOB VIOLATION - DISMISSED | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |
| Sep 4, 1990 | V*-DOB VIOLATION - DISMISSED | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |
| Sep 4, 1990 | V*-DOB VIOLATION - DISMISSED | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |