Bronx Highbridge
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 15, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN DUE TO FIRE.BLDGS SUFFRD A 3-ALARM FIRE ON 1/2/24 EXP1(FRONT)WALL FIRE DMGD@TOP STRY W/CHARRD FRAMNG&SHEATHNG AREAS OF MISSNG SHEATHNG@EXP3(REAR)WALL ON 2ND&3RD STORIES.1.NYSPE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 11/3/25,3.OBTN PRMTS&STRT WRK BY 11/17/25 |
| May 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.THE REMAINING WALLS IN THE REAR YARD ALONG THE LOT LINE SHARED W/ ADJ PROPERTY@918 SUMMIT AVE ARE IN STATE OF DISREPAIR.MULTIPLE CRCKS, OPEN JOISTS,&LOOSE MASONRY OBSRVD@THE BRCK/STONE/CMU RETAINING WALL COMPLY WITH DOB VIOLATION #010324FEU20401BS IMMEDIATELY |
| Jan 3, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.THE RETAINING WALLS IN THE REAR YARD ALONG THE LOT LINES SHARED W/ ADJ PROPERTY@918 SUMMIT AVE ARE IN STATE OF DISREPAIR.MULTIPLE CRCKS, OPEN JOISTS,&LOOSE MASONRY OBSRVD@THE BRCK/STONE/CMU RETAINING WALL 1.NYS PE STRCTRL OR GEOTECHNICAL ENGINEER TO IMMED EVAL ALL REAR RETAINING WALLS&DSGN RPAIRS,2.FILE FOR PRMT BY 4/5/24 |
| Jan 3, 2024 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | FULLY DEMOLISH BUILDING, GRADE & FENCE SITE, COORDINATE WITH ED FOR DEMO OF SEMI-DETACHED ADJACENT BUILDING AT 920 SUMMIT AVE |
| Jan 2, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL ACCESSIBLE OPENINGS TO SAFEGUARD THE PUBLIC AND PREVENT UNAUTHORIZED ACCESS TO THE BUILDING |
| Jan 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE, FIRE DAMAGE THROUGHOUT PREMISES ALONG WITH CHARRED ROOF RAFTERS AND INTERIOR FRAMING. |