Bronx Highbridge
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 30, 2022 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 22 LINEAR FEET OF TIGHT BOARD FENCE AT ENTIRE EXPOSURE#1 |
| Aug 29, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPO# 1 A SECTION OF CONCRETE HAS DETACHED & COLLAPSE INTO PUBLIC SIDEWALK. REMAINING SECTION AT UPPER PORTION SEVERE CRACKS WITH SEPARATION POTENTIAL OF FURTHER COLLAPSE. |
| Mar 6, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 6, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 27, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK. OWNER IS DIRECTED TO IMMEDIATELY PROCEED WITH THE EMERGENCY STABILIZATION AND DEMOLATION OF THE MASONRY RETAINING WALL, CONCRETE SLAB AND ADJACENT STRUCTURAL ELEMENTS AS SHOWN IN DRAWINGS PREPARED BY MARTIN MALEK P.E. EMERGENCY DEMOLATION TO COMMENCE NO LATER THAN 12/29/18.WORK TO BE PERFOMED UNDER FULL TIME SUPERVISION |
| Dec 21, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO PARTIAL COLLAPSE OF A CMU RETAINING WALL AT FRONT OF PREMISES RENDERING PREMISES NON-COMPLIANT AT TIME OF INSPECTION |