NYC Building Report

Bronx Mott Haven-Port Morris

9 Bruckner Boulevard, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

18 records

Date Status Type Summary
Jun 8, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLED/SPALLING BRICK WORK IN MULTIPLE LOCATIONS ON EXPOSURES 1 AND 4 ALSO DAMAGED/MISSING, MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE
Mar 31, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED @ EXP1 1FL CRACK, MISSING BRICK, OPEN JOINTS & 2FL VIEW MULTIPLE DEFECT THROUGH NETTINGS. EXPOSURE 4 OBSERVED SPALLING, DAMAGED JOINT & FAILED STUCCO. REMEDY: REPAIR AND/OR REPLACE
Oct 15, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBSERVED AT EXP 1 S.ELEV ERODED BRICKS & DETERIORATED MORTAR JOINTS, CRACKS, SPALLED BRICKS & FALLEN BRICK ON THE FLOOR. AT EXP 4 E.ELVE CRACKED STUCC, SPALLED BRICKS & DETERIORATED MORTAR JOINTS WERE OBSERVED. REMEDY: REPAIR AND OR REPLACE
Oct 15, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: AT TIME OF INSPECTI IT WAS OBSERVED @ EXPOSURE 1 (S.ELEV)ERODED BRICKS & DETERIORATED MORTAR JOINTS, CRACKS, SPALLED BRICKS & FALLEN BRICK ON THE FLOOR. AT EXP 4 (E.ELEV) CRACKED STUCCO, SPALLED BRICKS & DETERIORATED MORTAR JOINTS WERE OBSERVED. REMEDY: REPAIR AND/OR REPLACE
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jun 7, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG CODE COMPLIANCE. AT TIME OF INSPECTION I OBSERVED ON EXP #1 SOUTH ELEVATION & EXP #4 EAST ELEVATION; ERODED, DISINTEGRATING BRICKS & MORTAR JOINTS @ PARAPET. PARAPET ON EXPOSURE #1 WERE LOOSE DISLODGED BRICKS AND MORTAR JOINTS. REMEDY: REPLACE AND/OR REPLACE ALL DAMAGED MASONRY WORK ON ALL ELEVATIONS
Oct 4, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS NOTED BUILDING HAS DEFECTIVE CEMENTESOUS COATING DAMAGED MORTAR JOINTS AND SPALLING BRICKS ON EXPOSURE#1&4 REMEDY:MAINTAIN BUILDING COMPLY WITH CODE REPAIR DAMAGED FACADE
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Mar 9, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 23, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
May 4, 1998 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 9, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED