Bronx Hunts Point
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-02762-0095), so they can include other buildings on the same lot.
1218 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Apr 27, 2017 | B | VIOLATION CLOSED | 24 | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOWER SASH WINDOW BALANCES IN THE KITCHEN LOCATED AT APT 24, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 27, 2017 | B | VIOLATION CLOSED | 24 | § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 24, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 19, 2017 | A | VIOLATION CLOSED | 32 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th ROOM FROM EAST AT SOUTH, THE 4th ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 19, 2017 | C | VIOLATION CLOSED | 32 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL WALL IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 19, 2017 | A | VIOLATION CLOSED | 32 | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 19, 2017 | A | VIOLATION CLOSED | 32 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 17, 2017 | C | VIOLATION DISMISSED | 41A | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 41A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 14, 2017 | A | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REFIT DOOR TO ROOF AT BULKHEAD |
| Apr 14, 2017 | B | VIOLATION DISMISSED | 3 | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOORS AT BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION CLOSED | 3 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION CLOSED | 3 | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCES AT SOUTH AND WEST WINDOWS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION CLOSED | 3 | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT SOUTH WINDOW IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION CLOSED | 3 | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET , IN THE BATHROOM LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION CLOSED | 3 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL BEHIND WATER CLOSET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION CLOSED | 3 | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION DRAIN LINE AT BASIN SINK IN THE BATHROOM LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION CLOSED | 3 | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN AT BASIN SINK IN THE BATHROOM LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | C | VIOLATION CLOSED | 3 | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF RODENTS RATS IN THE ENTIRE APARTMENT LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION CLOSED | 3 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL AT WEST, BEHIND STOVE, IN THE KITCHEN LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Apr 14, 2017 | B | VIOLATION DISMISSED | 3 | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Feb 16, 2017 | B | VIOLATION DISMISSED | 4 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 4, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 16, 2017 | B | VIOLATION DISMISSED | 4 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 14, 2017 | A | VIOLATION CLOSED | 32 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE FOYER , THE 3rd ROOM FROM EAST LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | C | VIOLATION CLOSED | 32 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | A | VIOLATION CLOSED | 41 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 41, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | C | VIOLATION CLOSED | 41 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 41, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | C | VIOLATION CLOSED | 32 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | C | VIOLATION CLOSED | 32 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | B | VIOLATION DISMISSED | 41 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 41, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | C | VIOLATION DISMISSED | 41 | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE AIR VALVE AT WEST ONE RISER IN THE KITCHEN LOCATED AT APT 41, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | B | VIOLATION CLOSED | 32 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | B | VIOLATION DISMISSED | 32 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | B | VIOLATION DISMISSED | 32 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | A | VIOLATION DISMISSED | 32 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | C | VIOLATION DISMISSED | 32 | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 1; LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | B | VIOLATION DISMISSED | 32 | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 14, 2017 | A | VIOLATION CLOSED | Not available | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT NORTH ONE AT SOUTH SIDE OF BUILDING AT FIRE ESCAPE |
| Feb 8, 2017 | C | VIOLATION CLOSED | 41 | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK AT DOOR LEADING TO THE FIRE ESCAPE IN THE 1st ROOM FROM NORTH LOCATED AT APT 41, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 8, 2017 | C | VIOLATION CLOSED | 32 | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 6, 2017 | C | VIOLATION CLOSED | 1 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | A | VIOLATION CLOSED | 1 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE BATHROOM , THE 1st ROOM FROM EAST, THE FOYER , THE KITCHEN , THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | A | VIOLATION CLOSED | 1 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, EAST WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | B | VIOLATION CLOSED | 1 | § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... (APPROX. 4 SQ. FT.) AT WEST WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | A | VIOLATION CLOSED | 1 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, SOUTH WALL IN THE FOYER LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | A | VIOLATION CLOSED | 1 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | A | VIOLATION CLOSED | 1 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | A | VIOLATION CLOSED | 1 | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | A | VIOLATION CLOSED | 1 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | A | VIOLATION CLOSED | 1 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | C | VIOLATION CLOSED | 1 | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF RODENTS RATS LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2017 | B | VIOLATION CLOSED | 1 | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR -INOPERATIVE- LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |