Bronx Melrose
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 8, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: PROVIDE APPROX 91-0 LINEAR FEET OF PROTECTION TO COVER ENTIRE OF CRACKS OBSERVED TO PROTECT PUBLIC AND PROPERTY |
| Feb 17, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUEST ADDITIONAL INFORMATION-THE RESPONDENT IS DIRECTED TO PROVIDE A REVISED TR16 REPORT IN ACCORDANCE W/1RCNY 103-09 ALONG W/DETAIL CALC DWGS,FOUNDATION DETAILS,SOIL TYPES,ETC IDENTIFYING THE FACTUAL BASIS( INCL DATES PE PERSONALLY VISITED SITE)OF THE TR16 STRUCT ASSESSMENT REPORT REGARDING THE STRUCT STABILITY OF THE R/W |
| Oct 1, 2019 | V*-DOB VIOLATION - DISMISSED | RWNRF-RETAINING WALL NONE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |