Bronx Mott Haven-Port Morris
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Mar 27, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THERE ARE 2 APPRX 100 FT HIGH MONOPOLE SIGN STRUCTURE ON LOT.OWNER TO IMMED ENGAGE A NYS LIC PE EXP W/MONOLOLE SIGN STRCTRE&FOUNDTN,ETC FORENSICENG@BUILDINGS.NYC.GOV |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Jul 29, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO COMPLY WITH COMMISSIONER'S ORDER. COMM'S ORDER CONTRO NO 311271 WAS ISSUED ON 02/02/2015 REQUESTIONG ENGINEERING REPORT W/IN 60 DAYS. NO ENGINEERING REPORT WAS RECEIVED. COMPLY WITH COMM'S ORDER CONTROL NO. 311271 IMMEDIATELY |
| Feb 2, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | APPROX 100FT HIGH MONOPOLE SIGN STRUCTURE ON LOT.OWNER TO IMMEDIATELY ENGAGE NYS LICENSED PE EXPERIENCED WITH MONOPOLE SIGN STRUCTURE TO INSPECT THE MONOPOLE SIGN STRUCTURE, INCLUDING VISUAL INSPECTION ENGINEERING & MATERIAL TESTING EVALUATION OF ALL COMPONENT OF THE SIGN STRUCTURE & FOUNDATION ETC |
| Jan 22, 2001 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |