Bronx Williamsbridge-Olinville
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-04603-0027), so they can include other buildings on the same lot.
18 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Sep 15, 2026 | C | NOV SENT OUT | 1R | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Sep 15, 2026 | C | NOV SENT OUT | 1R | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Sep 15, 2026 | C | NOV SENT OUT | 1R | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Sep 15, 2026 | C | NOV SENT OUT | 1R | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, SOUTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Sep 15, 2026 | A | CIV14 MAILED | 1R | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Sep 15, 2026 | A | CIV14 MAILED | 1R | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Sep 15, 2026 | A | CIV14 MAILED | 1R | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR 508 EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Sep 15, 2026 | A | CIV14 MAILED | 1R | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jan 7, 2025 | B | VIOLATION DISMISSED | 2 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL AT BATHTUB BY METHOD OF REGLAZING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 7, 2025 | A | NOV SENT OUT | 2 | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILINGS, ALL WALLS, DOORS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 7, 2025 | B | VIOLATION DISMISSED | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 3, 2025 | C | INVALID CERTIFICATION | 2 | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES NO ELECTRICITY TO ALL CEILING LIGHT FIXTURES AND WALL OUTLETS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 3, 2025 | C | NOV SENT OUT | 2 | § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 31, 2024 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Dec 30, 2024 | C | VIOLATION DISMISSED | 2 | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING,OUTLETS AND WALL SWITCHES THROUGH-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 24, 2024 | B | VIOLATION DISMISSED | Not available | § 27-2010,2011,2012 ADMIN. CODE: CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE SEWEGE WATER AT CELLAR |
| Mar 27, 2024 | C | INVALID CERTIFICATION | 1R | § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 5, 2023 | B | INVALID CERTIFICATION | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR COLUMN FROM WEST AT BUILDING FRONT |