NYC Building Report

Bronx Concourse-Concourse Village

735 Walton Avenue, Bronx

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 2-02473-0043), so they can include other buildings on the same lot.

1246 records

Date Class Status Apartment Summary
Apr 16, 2022 B VIOLATION DISMISSED F8 § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT F8, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTH AT NORTHEAST
Apr 16, 2022 B VIOLATION DISMISSED F8 § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT F8, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTH AT NORTHEAST
Apr 16, 2022 C VIOLATION CLOSED C8 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C8, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTH AT NORTHEAST
Apr 16, 2022 C VIOLATION DISMISSED C8 § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT C8, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTH AT NORTHEAST
Apr 16, 2022 B VIOLATION DISMISSED C8 § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER ESCUTCHEON PLATE AT STEAM RISER AT WEST IN THE BATHROOM LOCATED AT APT C8, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTH AT NORTHEAST
Apr 16, 2022 B CERTIFICATION POSTPONMENT DENIED F4 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTHEAST
Apr 16, 2022 B CERTIFICATION POSTPONMENT DENIED E9 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E9, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM NORTH AT NORTHEAST
Apr 16, 2022 B CERTIFICATION POSTPONMENT DENIED E1 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E1, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM EAST AT SOUTHEAST
Apr 16, 2022 B CERTIFICATION POSTPONMENT DENIED D8 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D8, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTH AT NORTHEAST
Apr 16, 2022 B VIOLATION DISMISSED B18 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, EAST WALL, SOUTH WALL, CEILING IN THE BATHROOM LOCATED AT APT B18, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 16, 2022 A VIOLATION DISMISSED B18 § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT B18, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 16, 2022 A VIOLATION DISMISSED B18 § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT B18, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 16, 2022 A VIOLATION DISMISSED B18 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE FOYER LOCATED AT APT B18, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 16, 2022 B VIOLATION DISMISSED B18 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT B18, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 16, 2022 A VIOLATION DISMISSED B18 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT B18, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 16, 2022 C VIOLATION DISMISSED B18 § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT B18, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 16, 2022 C VIOLATION DISMISSED B18 § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT B18, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 16, 2022 C VIOLATION DISMISSED Not available § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR AT PUBLIC HALL, 3rd STORY, 1st SECTION FROM NORTH AT EAST
Apr 12, 2022 C VIOLATION DISMISSED Not available § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT FIRE DOORS AT PUBLIC HALL, 2nd STORY, 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED E10 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E10, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED E12X § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E12X, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B VIOLATION CLOSED E17 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E17, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED F2 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED F3 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F3, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTHEAST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED F7 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED D6 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D6, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT NORTHEAST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED C17 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C17, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 12, 2022 B VIOLATION CLOSED C12X § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C12X, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED C10 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C10, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B VIOLATION CLOSED B15 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B15, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM SOUTH AT SOUTHWEST
Apr 12, 2022 B NOV SENT OUT A8 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A8, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM NORTH AT NORTHEAST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED B14 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B14, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED B10 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B10, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B VIOLATION CLOSED B6 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B6, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT NORTHEAST
Apr 12, 2022 B VIOLATION CLOSED B5 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B5, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM NORTH AT NORTHEAST
Apr 12, 2022 B VIOLATION CLOSED A18 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A18, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B VIOLATION CLOSED A17 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A17, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTHWEST
Apr 12, 2022 B CERTIFICATION POSTPONMENT DENIED A10 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A10, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTHWEST
Mar 10, 2022 A VIOLATION DISMISSED F11 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE 2nd ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F11, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Mar 10, 2022 B VIOLATION DISMISSED F11 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, SOUTH WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT F11, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Mar 10, 2022 B VIOLATION DISMISSED F11 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F11, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Mar 10, 2022 C VIOLATION DISMISSED F11 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT F11, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Mar 10, 2022 A VIOLATION DISMISSED F11 § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT F11, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Mar 10, 2022 C VIOLATION DISMISSED F11 § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT F11, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Feb 16, 2022 C NOV SENT OUT F11 § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
Feb 16, 2022 C NOV SENT OUT F11 § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
Feb 6, 2022 C VIOLATION DISMISSED B10 § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT B10, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''N WEST''
Feb 6, 2022 B VIOLATION DISMISSED B10 § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SLIDING BOLT, CAPABLE TO ACCEPT PADLOCK, INSTALLED AT DOOR IN THE ENTRANCE LOCATED AT APT B10, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''N WEST''
Jan 27, 2022 B VIOLATION DISMISSED Not available § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE WEST YARD
Jan 26, 2022 C VIOLATION DISMISSED B6 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT B6, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH