Bronx Melrose
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 20, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 5, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM. THE BRICK FACADE ALONG EXP4 IS COMPROMISED W/SIGNIFICANTLY BULGING SECTIONS BENEATH WINDOWS.CRACKS ARE PROPAGATING FROM THE WINDOW AND DEVELOPING ACROSS THE FACADE. THE WALL IS NOT CODE COMPLIANT. REMEDY: IMMED RETAINA NYS PE TO PRODUCE REPAIR AND STABILIZATION DOCUMENTS FOR THE WALL. DWGS TO BE FILED BY 2/19/16 ALL WRK TO COMMENCE UNDER PERMIT |
| Feb 2, 2016 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Jan 28, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE BRICK FACADE ALONG EXP4 IS COMPROMISED W/SIGNIFICANT BULGING SECTIONS BENEATH THE WINDOWS. CRACKS ARE PROPAGATING FROM THE WINDOWS & DEVELOPING ACROSS THE FACADE.REMEDY: IMMED ERECT SIDEWALK SHED FOR THE FULL LENGTH OF THE WALL ALON EAST 154TH ST. SIDEWALK SHED TO BE IN PLACE NO LATER THAN 1PM ON MONDAY 2/1/16 PERMIT TO B/FILED 48HRS |