Bronx Pelham Parkway-Van Nest
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 4, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED UNPERMITTED CONSTRUCTION WORK IN PROGRESS AT FRONT PLATFORM AND STEP & THE TWO EXISTING SUPPORT COLUMNS FOR THE FRONT CANOPY WAS MOVED & IS NOW IN AN UNSAFE SUPPORT POSITION PLUS COLUMNS IS IN A STATE OF DISREPAIR. THIS COULD POTENTIALLY LEAD TO THE CANOPY COLLAPSING. THE ONLY EGRESS POINT TO THE BUILDING IS UNDER THE UNSAFE |
| Aug 2, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. I OBSERVED AN ILLEGAL 1BDRM CLASS A BASEMENT APARTMENT, NOTED KITCHEN SINK, GAS STOVE, 3 PIECE BATHROOM. GAS LINE, WATER AND WASTE LINES. NO SPRINKLER SYSTEM, LESS THAN 7' CEILING HEIGHT. A PARTIAL VACATE ORDER ISSUED FOR THE BASEMENT |
| Aug 2, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS. I OBSERVE THE BASEMENT WAS CREATED AND ARRANGED AS A 1BDRM CLASS A APARTMENT WITH A KITCHEN SINK, GAS STOVE, GAS LINE, WATER AND WASTE LINES. THE CEILING HEIGHT IS LESS THAN 7'. |