Bronx Pelham Parkway-Van Nest
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-04048-0008), so they can include other buildings on the same lot.
46 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| May 16, 2024 | A | NOV SENT OUT | 1L | § 27-2005 ADMIN. CODE: REFIT DOOR TO FRAME IN THE ENTRANCE LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | B | NOV SENT OUT | 1L | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ,MISSING CERAMIC WALL TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | B | NOV SENT OUT | 1L | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | B | NOV SENT OUT | 1L | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | B | NOV SENT OUT | 1L | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | A | NOV SENT OUT | 1L | § 27-2005 ADMIN. CODE: REFIT LOWER WINDOW SASH TO FRAME,1ST WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | C | NOV SENT OUT | 1L | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | C | NOTICE OF ISSUANCE SENT TO TENANT | 1L | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS ,RATS IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | B | NOV SENT OUT | 1L | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| May 16, 2024 | B | NOV SENT OUT | 1L | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 24, 2024 | B | NOV SENT OUT | 2FL1L | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2FL1L, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 24, 2024 | B | NOV SENT OUT | 2FL1L | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 2FL1L, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 24, 2024 | B | NOV SENT OUT | 2FL1L | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2FL1L, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 24, 2024 | B | NOV SENT OUT | 2FL1L | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2FL1L, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 24, 2024 | B | NOV SENT OUT | 2FL1L | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2FL1L, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Nov 27, 2023 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Mar 20, 2023 | C | NOV SENT OUT | 1R | § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Mar 24, 2022 | B | NOV SENT OUT | 1R | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 24, 2022 | B | NOV SENT OUT | 1R | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 24, 2022 | B | NOV SENT OUT | 1R | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 24, 2022 | B | NOV SENT OUT | 1R | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 23, 2022 | B | NOV SENT OUT | 1R | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 23, 2022 | B | NOV SENT OUT | 1R | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 23, 2022 | B | NOV SENT OUT | 1R | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHTUB & WASHBASIN IN THE BATHROOM LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 23, 2022 | B | NOV SENT OUT | 1R | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB & WASHBASIN IN THE BATHROOM LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 22, 2022 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Mar 18, 2022 | C | NOV SENT OUT | 1R | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | C | VIOLATION CLOSED | 1R | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | C | VIOLATION CLOSED | 1R | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | C | NOV SENT OUT | 1R | § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED NAILS AT SADDLE AT ENTRANCE IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | B | NOV SENT OUT | 1R | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | B | NOV SENT OUT | 1R | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | B | NOV SENT OUT | 1R | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES .... LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | B | NOV SENT OUT | 1R | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ... LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | B | NOV SENT OUT | 1R | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | A | NOV SENT OUT | 1R | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | A | NOV SENT OUT | 1R | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 18, 2022 | B | NOV SENT OUT | 1R | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Nov 14, 2021 | C | NOV SENT OUT | 1R | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Nov 7, 2011 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK THROUGH TO THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, APARTMENT AT EAST |
| Nov 7, 2011 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK THROUGH TO THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, APARTMENT AT EAST |
| Nov 7, 2011 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, APARTMENT AT EAST |
| Nov 7, 2011 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, APARTMENT AT EAST |
| Jun 6, 2008 | C | NOV SENT OUT | 2 | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 12, 2007 | B | NOT COMPLIED WITH | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 12, 2007 | B | NOT COMPLIED WITH | 2 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |