4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 20, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jul 9, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND AMENDMENT S REBAR INSTALLED IN FOUNDATION WALL IS NOT NOTED ON DRAWING W/ ALL RE LATED DETAILS FOR 616, 614, 612, 610, 608 REMEDY: STOP ALL WORK. PROVIDE ALL REQUIRED FILING TO SHOW DETAILS O F HOW REBAR IS IN FOOTING IF ANY. AND FOUND WALL REBAR |
| Sep 22, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | INADEQUATE DETAILS ON APPROVED PLANS FOR STRUCTURAL FOUNDATIONS PERMIT # 201050423. SOIL BELOW DESIGN FOOTINGS HAS BEEN OVER EXCAVATED APPROXIMATELY 2 TO 3 FT BELOW TO REMOVE OIL TANKS. PLANS SHOW UNDISTURBED SOIL UNDER FOOTINGS REMEDY: AMEND PLANS TO SHOW FOUNDATION DESIGN BELOW FOOTINGS |
| Jul 15, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | MISC VIOLATIONS FAILURE TO PROVIDE 3 FOOT 6 INCH GUARD RAIL OR SOLID E NCLOSURE AROUND OPEN AND ACCESSIBLE SIDES OF EXCAVATION CURRENTLY AREA AROUND PRE EXISTING CELLAR IS OCCESSIBLE 3FT TO 6 FOOT DROP VARIES LO CATION INTERIOR OF WORK SITE AT 151 ST REMEDY: STOP ALL WORK PROVIDE PERIMETER RAILINGS AT ALL ACCESSIBLE LOC |