Bronx Pelham Parkway-Van Nest
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL ERECTED VARIOUS FULL HEIGHT PARTITIONS AND DOORS TO CREATE BATHROOM, AND 2 ADDITIONAL ROOMS, WITH ADDITIONAL 110-VOLT ELECTRICAL LINES FOR LIGHTS, SWITCHES, AND OUTLETS, AND 220-VOLT LINE FOR STOVE. INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK, AND 3-PIECE BATHROOM (TOILET, SINK, TUB). |
| Jul 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OCCUPANCY CONTRARY; NOTED OFFICIAL BUILDING DEPARTMENT RECORDS INDICATES BUILDING AS 2 FAMILY 2 STORY. OCCUPANCY CONTRARY NOTED AT CELLAR LEVEL SET -UP AND ARRANGED AS A CLASS A APARTMENT WITH KITCHEN WITH RESIDENTIAL SINK, ELECTRIC STOVE, 3-PIECE BATHROOM, AND 2 ADDITIONAL ROOMS. VACATE CELLAR. |