DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 7, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM ROCK OUTCROPPING. AT THE TIME OF INSPECTION PORTIONS OF THE ROCK OUTCROPPING HAD COLLAPSE INTO ADJACENT SIDEWALK. OWNER IS DIRECTED TO IMMEDIATELY RETAIN A STRUCTURAL GEOTECHINAL ENGINEER TO PROVIDE PROTEC PROTECTION OF THE PUBLIC RIGHT OF WAY. REMEDY: DEMOISH/STABLIZED UN-ST ABLE ROCK SLOPE. WORK TO COMMENCE UNDER P.E SUPERVISION BY 8/16/2023 |
| Aug 15, 2023 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | -IMMEDIATELY PROVIDE PROTECTION FOR THE PUBLIC-RIGHT-A-WAY, FROM THE THE FAILING ROCKS. ERECT PHYSICAL BARRIER APPROX. 30FT LONG SEPARATION SIDEWALK FROM UNSTABLE ROCK OUTCROPPING -DEMOLISH UNSTABLE PORTIONS OF THE ROCK OUTCROPPING,UNTIL STABLE ROCK IS FOUNDPROVIDE STEEL NETTING WITH EMBEDDED ROCK ANCHORS TO PREVENT FUTURE ROCK OUTCROPPING FAILURE- |
| Aug 15, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMMEDIATELY PROVIDE PROCTECTION FOR THE PUBLIC-RIGHT-A WAY, FROM THE FAILING ROCKS, ERECT PHYSICAL BARRIER APPROX. 30FT LONG SEPARATING SIDEWALK FROM UNSTABLE ROCK OUTCROPPING -DEMOLISH UNSTABLE PORTIONS OF THE ROCK OUTCROPPING, UNTIL STABLE ROCK IS FOUND -PROVIDE STELL NETTING WITH EMBEDDED ROCK ANCHORS/PREVENT FUTURE ROCK OUTCROPPING- |