Bronx Tremont
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 30, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 30, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 23, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM. BLDG ROOF WAS REMOVED.FRONT WALL AND REAR WALL ARE NOT ADEQUATELY BRACED. NOTICE TO REVOKE PERMIT WAS ISSUED ON 5/3/2016. REMEDY:OWNER TO OBTAIN/REINSTAL PERMIT IMMED. START WORK UNDER PERMIT NO LATER THAN JUNE 06, 2016 AND SIGN OFF JOB NO LATER THAN SEPTEMBER 06, 2016 |
| Aug 20, 2015 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM 7 ADDITIONL INFORMATION. ROOF PARTIALLY COLLAPSED IN OCTOBER 2014 NO REPAIR WORK HAS BEEN STARTED.STRUCTURAL CONDITION OF BLDG IS QUESTIONABLE. OWNER TO IMMEDIATELY ENGAGE LIC PE TO INSPECT BLDG & SUBMIT WKLY ENGINEERING RPT TO NYCDOB FORENSIC ENGG.ATTN PETER SUN RPT DUE NO LTR THAN 12PM EVERY FRIDAY STARTING FROM 8/28/2015 |
| Aug 20, 2015 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSSIONERS ORDER CONTROL NO. 311228 COMMISSIONERS ORDER CONTROL NO. 311228 ISSUED ON 10/27/14 REQUIRES REPAIR WORK TO START NO LATER THAN 11/11/14. NO WORK HAS BEEN STARTED PER ENGINEER M.A. ALI, PE COMPLY W/COMMISSIONERS ORDER #311228 IMMEDIATELY |
| Jan 14, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 29, 2014 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | FULL VACATE |
| Oct 27, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN. APPROX. 20' X 20' ROOF COLLAPSED. FLOOR IN THE RE STAURANT IS NOT EVEN AND BULGING. REMEDY: OWNER TO IMMEDIATELY HAVE A LICENSED PE TO INSPECT AND EVALUATE THE ENTIRE BUILDING, AND OBTAIN PE RMIT FOR REPAIR. START REPAIR WORK NO LATER THAN NOVEMBER 11, 2014 |
| Jul 13, 2011 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |