NYC Building Report

Bronx Morrisania

595 East 167 Street, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

32 records

Date Status Type Summary
Dec 1, 2023 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Sep 21, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9A UNSAFE REPORT FILED
Feb 22, 2022 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Apr 26, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 2, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Apr 19, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Jul 7, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Feb 24, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 30, 2014 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
May 1, 2014 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Mar 11, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 31, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
Feb 9, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 10, 2011 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL MATTERS NOT PROVIDED
Mar 7, 2011 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 14, 2009 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 3, 2008 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 24, 2007 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Nov 30, 2007 V*-DOB VIOLATION - DISMISSED LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
Apr 20, 2007 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 22, 2005 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Feb 25, 2004 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 19, 2003 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 27, 2001 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
May 16, 2000 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 2P768
Aug 5, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 2P768
Oct 21, 1996 VP*-VIOLATION UNSERVED ECB- DISMISSED E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 25, 1989 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (51)RESTORE ELEVATOR TO SERVICE SO A PROPER INSPECTION MAY BE MADE BY INSPECTION FROM THIS DEPT
Aug 1, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (51)PROVIDE SHOY RING PINS FOR BRAKE(52)RENEW COUNTERWEIGHT SPRIN G (53)RENEW CAB FLOORING(54)REPAIR MACHINE(55)FILE PROPER PAPERS WITH THIS DEPT.REGARDING NEW BRAKE,STATION, BASEMENT CUT OFF SWITCH(56) PROPERLY PLACE LEEDS IN SPLICE BOT MAIN MACHINE.(57)REPAIR FIRST FLOOR DOOR LOCK ROBLER & CAM