NYC Building Report

Bronx Mott Haven-Port Morris

570 St Marys Street, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

36 records

Date Status Type Summary
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Feb 21, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 24, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.5 STRY+CELLAR MASONRY WALLS+WOOD JOISTS&STEEL BEQAMS FRAMED FLRS, RESID BLDG SUSTAIN SIGNIFICANT FIRE DAMAGE.FALLEN &LOOSE CEILING PLASTER&WATER DAMAGE FOUND THRUOUT.CORNICE IN DANGER OF FALLING @SIDE WALL.REMEDY:OWN ENGAGE LIC ENG&CONT'R EVAL BLDG&PREP RPR DWGS,PLANS& DETAILS.FILE FOR PERM FOR RPR WRK NO LATER 2/15/18.START WRK BY 3/1/18
Jan 24, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WRK.5 STRY+CELLAR MASONRY WALLS+WOOD JOISTS&STEEL BEAMS FRAMED FLRS RESID BLDG.THERE ARE 4 LINES OF APTS A,B,C&D.BLDG SUSTAIN SIGNIF FIRE DAMAGE 1/22/18.WATER DAMAGE FOUND THRUOUT.LOOSE&FALLEN CEILING PLASTER FOUND.REMEDY:OWN IMMED REMOVE&RPR LOOSE&DAMAGE CEILING PLASTER CLEAN UP APTS,HALLWAY&STAIRS.PROV FIRE GUARDS
Jan 24, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WRK.5 STRY+CELLAR MASONRY WALLS+WOOD JOISTS&STEEL BEAMS FRAMED FLRS,RESID BLDG.THERE ARE 4 LINES OF APT A,B,C&D LINES.BLDG SUSTAIN SIGNIFICANT FIRE DAMAGE ON 1/22/18.FALLEN&LOOSE CEILING PLASTER FOUND THRUOUT A&B LINES.REMEDY:OWN IMMED INSTALL SIDEWALK SHED AT FRONT&SIDE WALL.TEMP COVER ROOF.FILE FOR PERM NO LATER 1/26/18
Jan 22, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DUE TO FIRE
Nov 14, 2016 V-DOB VIOLATION - ACTIVE ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Feb 24, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 22, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 28, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 18, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 27, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Feb 25, 2011 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 15, 2010 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 8, 2009 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 19, 2007 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 9, 2006 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 20, 2005 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 28, 2005 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 19, 2003 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 3, 2001 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 2P4700
May 3, 2000 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 2P4700
Feb 7, 2000 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 12, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 2P4700
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 9, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 28, 1993 V*-DOB VIOLATION - DISMISSED LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL 1
May 17, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Apr 12, 1989 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Nov 10, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (51) REPLACE MISSING SPLICE BOX COVER WHERE NECESSARY. (52).RE- PLACE MISSING HAND RAIL IN CAB. (53) REPAIR PIT LIGHT. (54) REPLACE MISSING LIMIT COVERS