Bronx Tremont
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-03044-0047), so they can include other buildings on the same lot.
375 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Sep 20, 2015 | B | VIOLATION CLOSED | 4E | SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 12, 2014 | B | VIOLATION DISMISSED | 2B | SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK AT EAST WALL IN THE KITCHEN LOCATED AT APT 2B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 12, 2014 | B | VIOLATION DISMISSED | 2B | SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 2B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 12, 2014 | B | VIOLATION DISMISSED | 2B | SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 2B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 12, 2014 | A | VIOLATION DISMISSED | 2B | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 12, 2014 | A | VIOLATION DISMISSED | 2B | SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 2B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Oct 31, 2014 | B | VIOLATION DISMISSED | 2B | SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS FAUCET AT SINK IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Oct 31, 2014 | A | VIOLATION DISMISSED | 2B | SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Sep 29, 2014 | B | VIOLATION DISMISSED | 4C | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY |
| Sep 29, 2014 | A | VIOLATION DISMISSED | 4C | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Sep 29, 2014 | B | VIOLATION DISMISSED | 4C | SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| May 23, 2013 | B | VIOLATION CLOSED | 1E | SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| May 23, 2013 | B | VIOLATION CLOSED | 1E | SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Mar 29, 2012 | A | VIOLATION CLOSED | 3E | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ,,,,BELL/BUZZER INTERCOM SYSTEM IN THE ENTRANCE LOCATED AT APT 3E, 3rd STORY, APARTMENT AT SOUTH |
| Mar 29, 2012 | A | VIOLATION CLOSED | 3E | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, APARTMENT AT SOUTH |
| Mar 29, 2012 | A | VIOLATION CLOSED | 3E | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, APARTMENT AT SOUTH |
| Mar 29, 2012 | A | VIOLATION CLOSED | 3E | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ...ALL CEILING AND ALL WALLS THROUGHT IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, APARTMENT AT SOUTH |
| Mar 29, 2012 | A | VIOLATION CLOSED | 3E | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ...ESCUTCHEON AT RISER IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, APARTMENT AT SOUTH |
| Feb 29, 2012 | A | VIOLATION CLOSED | 3E | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 4th STORY, APARTMENT AT SOUTH |
| Feb 29, 2012 | A | VIOLATION CLOSED | 3E | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT 3E, 4th STORY, APARTMENT AT SOUTH |
| Feb 14, 2012 | A | VIOLATION CLOSED | 4A | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTER BALANC ES LOWER WINDOW SASH IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Jan 27, 2012 | B | VIOLATION CLOSED | 4A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE FOYER LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Jan 11, 2012 | B | VIOLATION CLOSED | 1B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 11, 2012 | C | VIOLATION CLOSED | 1B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jul 10, 2009 | B | VIOLATION CLOSED | 4A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |