Bronx Belmont
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 3, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER DUE TO IMMEDIATELY HAZARDOUS CONDITIONS OBSERVED BULGING MASONRY BRICK AT SOUTH EXP#3 DIRECTLY ABOVE 4660 3RD AVENUE ROOF. THESE CONDITIONS HAVE THEREFORE MADE ROOF UNABLE TO BE OCCUPIED REMEDY: VACATE THE ENTIRE ROOF OF 4660 3RD AVENUE ROOF AREA TO BE USED IN EMERGENCIES ONLY |
| Mar 28, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.ROOF IS CFSJOISTS W/STEEL BEAMS&METAL DECK.EXP3 REAR WALL APPRX 132LF ABUTS ELEVATED PARKING LOT @480 E188 ST EXP2 HAD APPRX 5FT TALL CMU WALL BUILT.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE DWGS W/DOB.PERM RPAIR THE BLDG UNDR PRMT STRTNG BY 5/12/25&CMPLTD/SGN OFF |
| Mar 28, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.ROOF IS CFS JOISTS W/STEEL BEAMS&METAL DECK.EXP3 REAR WALL APPRX 132LF ABUTS ELEVATED PARKNG LOT @480 E188 ST EXP2 HAD APPRX 5FT TALL CMU WALL BUILT.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE DWGS W/DOB.PERM RPAIR THE BLDG UNDR PRMT STRTNG BY 5/12/25&CMPLTD/SGND OFF 6/20/25 |