NYC Building Report

Bronx West Farms

437 Morris Park Avenue, Bronx

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 2-04007-0001), so they can include other buildings on the same lot.

1161 records

Date Class Status Apartment Summary
Jan 26, 2022 A VIOLATION DISMISSED A52 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST, THE BATHROOM , THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT A52, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 26, 2022 A VIOLATION DISMISSED B41 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th ROOM FROM EAST, THE BATHROOM LOCATED AT APT B41, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 26, 2022 C VIOLATION CLOSED B41 § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT B41, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 26, 2022 B VIOLATION DISMISSED B41 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT B41, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 26, 2022 B VIOLATION DISMISSED B41 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT B41, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 26, 2022 A VIOLATION DISMISSED B41 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT B41, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 26, 2022 C VIOLATION DISMISSED B41 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT B41, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 26, 2022 C VIOLATION DISMISSED B41 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT B41, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 26, 2022 B VIOLATION CLOSED B46 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B46, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Jan 26, 2022 B VIOLATION CLOSED A52 § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 10 SQ/FT AT THE WEST WALL IN THE BATHROOM LOCATED AT APT A52, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 26, 2022 A VIOLATION CLOSED A52 § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 6 SQ/FT AT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT A52, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 26, 2022 B VIOLATION CLOSED A52 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A52, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 26, 2022 C VIOLATION DISMISSED A52 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A52, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 26, 2022 C VIOLATION DISMISSED A52 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT A52, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Dec 30, 2021 A VIOLATION DISMISSED B56 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER LOCATED AT APT B56, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 C VIOLATION CLOSED Not available § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
Dec 30, 2021 B VIOLATION CLOSED B66 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B66, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED A65 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A65, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A62 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A62, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A61 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A61, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED B56 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B56, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B55 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B55, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B54 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B54, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B53 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B53, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B51 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B51, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED A55 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A55, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A53 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A53, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED B44 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B44, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B43 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B43, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B41 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B41, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED A43 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A43, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A42 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A42, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED B36 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B36, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B33 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B33, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B32 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B32, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B31 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B31, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED A36 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A36, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A34 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A34, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A33 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A33, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A32 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A32, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED B22 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B22, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED B21 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B21, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED A25 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A25, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A23 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A23, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED A22 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A22, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Dec 30, 2021 B VIOLATION CLOSED B2 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B2, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH
Dec 30, 2021 B VIOLATION CLOSED A3 § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A3, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
Nov 5, 2021 C VIOLATION CLOSED B32 § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
Aug 5, 2021 A VIOLATION DISMISSED A25 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 2nd ROOM FROM EAST, THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY , THE FOYER , THE BATHROOM , THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT A25, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Aug 5, 2021 B VIOLATION DISMISSED A25 § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE NORTH WALL IN THE BATHROOM LOCATED AT APT A25, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST