NYC Building Report

Bronx Wakefield-Woodlawn

4318 Vireo Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

5 records

Date Status Type Summary
Sep 6, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL UPON INSPECTION OBSERVED AT EXP.2/DRIVEWAY, CONCRETE SLAB IS CUT TO CREATE AN OPENING APPROX. 4FT.(W)X12FT.(L) AND EXCAVATION WORK IN PROGRESS LEADING DOWN TO BASEMENT LEVEL, WHERE FOUNDATION WALL IS CUT FOR ACCESS TO BASEMENT. ALL WORK BEING DONE WITHOUT ANY PERMITS ON FILE.
Oct 1, 2019 V*-DOB VIOLATION - DISMISSED RWNRF-RETAINING WALL NONE FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
Nov 15, 2017 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 15, 2017 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Aug 25, 2017 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.OBSERVED DEFECT COND AT REAR GARAGE.STEP CRACKS AT REAR CORNER OF GARAGE.HORIZONTAL&VERT CRACKS AT FRONT&REAR OF GARAGE.BACKFILL AT SOIL AT REAR OF GARAGE INCLUDED OLD RUBBER TIRE&OTHER DEBRIS.REMEDY:OWNER RETAIN PROF ENG'R OR REG ARCH ASSESS ENTIRE GARAGE BLDG&RETAIN DOB REG CONT'R REPAIR ALL DEFECTS,UND ACTIVE PERM BY 11/30/17