Bronx Wakefield-Woodlawn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD SEVERAL CRACK AND MISSING MORTAR THROUGHOUT EXP1 AND @ EXP1/2 CORNER. OWNER TO IMMED RETAIN RDP IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY 6/15/26 |
| Sep 7, 2023 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | INSTALL APPROX 50 LF (20LF ALONG EXP 2 & 30LF ALONG EXP 3) OF SIDE WAL 715 E 233 ST REAR YARD TO PROTECT PATH OF EGRESS AT OCCUPIED MULTIPLE 2) INSTALL ROOF PROTECTION AT 4206 & 4200 WHITE PLAINS WITHIN 25 FT MNEY RADIUS OF CHIMNEY |
| Sep 1, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED ON ROOF LEVEL DISLODGED BRICKS, MORTAR AND STEPS CRACKS AT CHIMNEY. THE STEP CRACKS START AT APPROXIMATELY 4 FT FROM TOP CHIMNEY AT EXPOSURE 1 AND ALSO EXPOSURE 4. AT EXPOSURE 1 OF CHIMNEY THERE IS COMPLETE SEPARATION OF BRICKS AND MORTAR. THIS CAUSES A SERIOUS RISK TO THE ADJACENT PROPERTIES AND ALSO THE REAR OF BUILDING AT 719 EAST |
| Apr 11, 2001 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Apr 11, 2001 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Jan 13, 2000 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Jan 13, 2000 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Feb 19, 1999 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Feb 19, 1999 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Apr 28, 1998 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Apr 28, 1998 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |