Bronx Eastchester-Edenwald-Baychester
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 27, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. I OBSERVED THE PLUMBING AND HEATING COMPONENTS WERE REMOVED FROM THE INTERIOR WITH NO PERMIT ON FILE |
| Aug 27, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. I OBSERVED THE ELECTRICAL WAS REMOVED FROM THE INTERIOR OF THE BUILDING. NO PERMIT ON FILE |
| Aug 27, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. A FULL STOP WORK ORDER ISSUED. I OBSERVED THE INTERIOR WALLS, ELECTRICAL AND PLUMBING WERE REMOVED. I OBSERVED THE SOIL AND REAR CONCRETE PATIO ALTERED, WITH EVIDENCE OF A NEW CONCRETE SLAB POURED. THE WORK IS AROUND 75% COMPLETED. NO PERMITS ON FILE. |
| Sep 11, 2013 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |