NYC Building Report

Bronx Norwood

374 East 209 Street, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Aug 6, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.DUE TO FIRE ON 8/5/26,3RDFL APT 3A PARTIALLY CLLPSD INTO APTA AT EXP2/3 CRNR.SURROUNDNG FL FRAMNG@3RDFL&APT A,B,&C LINES@4TH&5THFL WERE SEV DMGD&SAGGNG.EXP3WALL INAD BRACED.OWNR TO RTAIN NYSPE,DOB REG GC,&ASBESTOS CNTRCTR TO IMMED: 1.PE TO SBMT MEANS& METHDS BY 8/7/26 TO FEU&DEP TO REVIEW/APPR
Aug 6, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.DUE TO FIRE ON 8/5/26,3RD FL APT3 PRTLYL CLLPSD INTO APT 2A@EXP 2/3 CRNR.SURROUNDNG FL FRAMNG@ 3RDFL &APT A,B,&C LINES@4TH FLS WERE SEV.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 9/21/26&CMPL
Aug 5, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. PREMISES IS A 5 STORY WITH BASEMENT MASONRY NON FIRE PROOF BUILDING WITH HEAVY SMOKE,FIRE, AND WATER DAMAGE THROUGHOUT. WINDOWS MISSING ON ALL FLOORS,INTERIOR FLOOR COLLAPSE FROM 3RD FLOOR TO SECOND FLOOR. LARGE SECTION OF ROOF OPEN
May 15, 2014 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Jan 25, 2012 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 31, 2009 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 19, 2003 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED