Bronx Throgs Neck-Schuylerville
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 17, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL ERECTED VARIOUS FULL HEIGHT PARTITIONS TO CREATE BATHROOM, AND 3 ADDITIONAL ROOMS (ONE THE GARAGE) INSTALLED ADDITIONAL 110-VOLT ELECTRICAL LINES FOR LIGHT SWITCHES AND OUTLETS, 220-VOLT ELECTRICAL LINE FOR STOVE. INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK, 3-PIECE BATHROOM (TOILET, SINK, TUB). |
| May 17, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | RESIDENCE ALTERED; NOTED C/O #57014 INDICATES BUILDING AS 2 STORY 2 FAMILY, CELLAR AS 1 CAR GARAGE, BOILER ROOM, STORAGE. CELLAR HAS NOW BEEN ALTERED TO A CLASS A APARTMENT WITH A KITCHEN WITH A RESIDENTIAL SINK, ELECTRIC STOVE, A 3-PIECE BATHROOM (TOILET, SINK, TUB) AND 3 BEDROOMS. |