Bronx Morrisania
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 27, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM-BLDG HAD UNGRACED CELLAR WALL AT EXP 2(WEST)DUE TO EXCAVATION AND UNDERPINNING BY NEW BLDG CONSTRUCTION. CELLAR WALL AT EXP 2 ROTATED OUTWARD AND IS BULGING AT 1FL LEVEL. WOOD FRAMING HAS TERMITE DAMAGE AT EXP 2. REMEDY: NYSPE TO IMMED EVAL ENTIRE BLDG AND DESIGN REPAIRS. FILE FOR PERMIT BY 12/13/2021. OBTAIN PERMIT |
| Sep 27, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK:BLDG HAD UNBRACED CELLR WALL@EXP2 SIDE DUE EXCAV+UNDRPINNING CELLR WALL ROTATD OUTWRD+BULG@1FL LVL @EXP2.WD FRMG HAS TERMITE DMG AT EXP2 RIM JOIST @1FL LVL+NO POSITVE CONNECTS BTWN RIM JOIST+JOIST@1FLR CRCKS/SEPART.IMMD INSTL TMP SHOR+BRCE ALNG EXP2 PER PE STRL ENGNR.WORK DIRCT SUPV PE.FILE W/I 2 DAY.PROV NAME+LIC PE+CONTR DOB.MONTR CRKS BLD |
| Sep 26, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMLIANT REQUESTING AN ENGINNERS REPORT DUE TO SUBSTATIAL FONDATION CRACKS AT VARIOUS LOCATIONS -SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NYC,GOV |
| Sep 26, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO CONSTRUCTION ACTIVITIES AT 369 EAST 159TH STREET CAUSING SUBSTA NTIAL CRACKS AT THE FOUNDATION LEVEL ( VACATE ENTIRE BUILDING ) |