Bronx Kingsbridge Heights-Van Cortlandt Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
17 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 2, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DOB INTENT TO REVOKE APPROVAL(S) AND PERMIT(S) APPLICATION #X00750693-I1 DUE TO SPECIAL INSPECTOR WITHDRAWAL. |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Apr 29, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT A SIDEWALK SHED , ENTIRE LENGTH OF BUILDING APPROXIMATELY 80 LINEAR FEET AT EXPOSURE#1 |
| Nov 4, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN-MASONRY WALLS&WOOD ROOF SUSTAINED FIRE DAMAGE ON 11/01/21.MODERATE DAMAGES TO INTERIOR AT ALL STORES ON BAILY AVE WITH COLLAPSE CEILINGS AND OPEN ROOF.OWNER TO ENGAGE NYSPE AND CONTRACTOR TO REPAIR BUILDING UNDER PERMIT.FILE FOR PERMIT BY 12/01/2021.START WORK BY 01/01/2022 |
| Nov 2, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Mar 16, 2020 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| Aug 17, 2017 | VP-VIOLATION UNSERVED ECB-ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 13, 2011 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |