Bronx Williamsbridge-Olinville
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
23 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 21, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY - THE FRONT DOOR AT EXPOSURE 1 NEEDS TO BE SEALED |
| Jul 20, 2026 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Apr 7, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: INSTALL APPROXIMATELY 35 LINEAR FEET OF SIDEWALK SHED ALONG THE ENTIRE FRONT OF EXPOSURE 1. THIS INCLUDES THE EXTENSION OF 5 FEET PAST THE BUILDING ON BOTH SIDES. THE SIDEWALK SHED SHALL BE INSTALLED TIGHT BACK TO THE BUILDING AND EXTEND ACROSS THE SIDEWALK |
| Jan 18, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.OBSRVD FACADE IN STATE OF DISREPAIR W/CRACKS@EXPOSURE 1CRNRS, BULGING@EXP1 UPPER LVL,EXP1 PARAPET LEANING INWARD,CRACKS ATWINDOW& DOOR LINTELS THROUGHTOUT&SPALLD |
| Dec 28, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.OBSRVD FACADE IN STATE OF DISREPAIR W/CRACKS@EXPOSURE 1CRNRS, BULGING@EXP1 UPPER LVL,EXP1 PARAPET LEANING INWARD,CRACKS AT WINDOW & DOOR LINTELS THROUGHOUT&SPALLD BRCKS&MASNRY MORTAR THROUGHOUT.OWNR TO ENGAGE A NYS PE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG OBTAIN PRMTS TO RPAIR BY 1/18/24.SGN OFF PRMTS BY 4/1/24 |
| Dec 28, 2023 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 25 LINEAR FEET SIDEWALK SHED AT EXPO 1 |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED ALL EXPOSURE HAS VERTICAL AND HORIZONTAL CRACKS. SPECIALLY AT EXP# 4 CORNER 2" CRACK FROM 1ST FLOOR TO TOP OF BUILDING, AND ALSO MISSING SOME BRICKS. STRUCTURAL STABILITY OF BUILDING FACADE. IT'S DANGER TO OCCUPANCY AND PEDESTRIAN. |
| Oct 30, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 22, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 26, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 17, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 6, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 9, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 28, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 31, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 5, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 11, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 30, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 2, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM 3 STRY+CELL MASONRY WALLS+WOOD FRAME FLRS DETACH RESID BLDG IN DISREPAIR.THE FW IS DETACH FROM NW.CRACKS&DETERIORATED BRICKS&MORTAR JOINTS FOUND THROUGHOUT.REAR WALL IS BOWING AT 1STFL.CRACKS&EXCESSIVE DEFLECTION FOUND AT 1STFL.REMEDY:OWN ENGAGE LIC PE&CONT'R EVAL&RPR THE BLDG.FILE PERM FOR RPR WRK NO LATER 5/25/18.START WRK NO LATER 6/15/18 |
| Apr 18, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 21, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 3, 1993 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Apr 27, 1993 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |