Bronx Eastchester-Edenwald-Baychester
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
42 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 27, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING FACADE AND APPURTENANCES.ON 1/24/26,A FIR E INCIDENT OCCURED WHICH DISPLACED SECTION OF THE CAVITY WALL CONSTRUC TION.REMEDY:OWNER TO IMMEDIATELY RETAIN SERVICES OF NYS REG DESIGN PRO WITH QEWI CERT TO INSPECT AND EVALUATE 100% OF ENTIRE CAVITY WALL SYST EM(HANDS ON SOUND WITH PROBE)AT ALL EXPOSURES EXCEPT SECTIONS OF WALL |
| Jan 27, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.BLDG WAS DMGD DUE TO GAS EXPLOSION ON 1/29/26 SEVERE DMGD NOTED@THE 16THH&17THFLS.WALLS OF PUBLIC HALLWAY PRTLLY CLLPSD.ELEVATOR SHAFT WALL BULGNG&CMPRMSD@16TH FL.UNDR DRCT&CONTINUOUS SPRVSN OF PE TO 1.SECURE THE DMDG SECTION OF THE HALLWAY W/PLYWOOD DOORS&LOCKS,2.EVAL DEMO/REBUILT |
| Jan 27, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.BLDG DMGD DUE TO A GAS EXPLOSION ON 1/24/26 SEVERE DMG NOTED@THE 16TH&17TH FL.UNIT 16A EXT WALL@THE LIVING ROOM HAD BLOWN OUTWRD.WATER FILLED CANTY WALLS&WATER RUNNING ALNG FCDE.UNDR DRCT@CONTINUOUS SPRVSN OF PE,QEWI,&SSM IMMED DO 1.REMOVE CMPRMSD SEALNG OF THE EXT WALL@17THFL,2.PRVDE WTHRTGHT |
| Jan 27, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.BLDG WAS DMGD DUE TO GAS EXPLOSION ON 1/29/26 SEVERE DMG NOTED@THE 16TH&17THFLS.UNITS 16A EXT WALL@THE LIVING ROOM SEVERELY BULGNG OUTWRD.WALLS OF THE LIVING RM BLOWN OUT.OWNR TO ENGAGE PE&CNTRCTR TO EVAL THE ENT BLDG.STRUCTURE & FACADE&REPAIR UNDR PRMT.CMPLTE RPAIR&SGN OFF BY 4/11/2026 |
| Jan 24, 2026 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | CEASE USE 2P4106 |
| Jan 24, 2026 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | CEASE USE 2P4105 |
| Jan 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURED RENDERED NON COMPLIANT DUE TO EXPLOSION AT EXPSORURE #3 DAM AGED FACADE & CONSTRUCTION EUIPMENT ALSO SIDEWALK SHED . STOP ALL FACA DE & ROOF , SUSPENDED SCAFFOLDING WORK FACADE MUST BE REAPAIRED & EQUIPMENT |
| Jan 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT . DUE TO GAS EXPLOSISON AT 16TH & 17T H FLOORS STRUCTURAL STABILITY REQUESTED INTERIOR ELEVATORS SHAFT APT 16A, 16B, 16J, 17A,17B,17J HALLWAY WALLS PARTAILLY COLLAPSED. OWNERS T O HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NY.GOV. W/IN 14 DAYS ADDRESSING ALL CONDITIONS, W/PLANS/PHOTOS,RECOMENDING TIME FRA |
| Jan 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO EXPLOSION GAS AT 16TH & 17TH F LOORS STRUCTURAL STABILITY REQUESTED AT EXPOSURE #3 FACADE. LOOSE BRIC KS.& PARTIAL COLLAPSE. ...OWNER TO HIRE A NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV. WITHIN 7 DAYS ADDRESSING ALL CONDITI ONS W/PLANS, PHOTOS, RECOMMENDING TIME FRAME TO BE COMPLETED |
| Jan 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURAL RENDERED NON-COMPLIANT. BUILDING SUSTAINED EXTENSIVE FIRE, WATER, SMOKE DAMAGED DUE TO GAS EXPLOSION AT 16 & 17 FLOORS. PARTITIONS, EXTERIOR STRUCTURAL DAMAGE, LOOSE BRICKS POTENTIAL TO COLLAPSE, AND WALLS BULGING. |
| Feb 22, 2024 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| Feb 22, 2024 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 22, 2023 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) |
| Aug 21, 2022 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) |
| Jun 20, 2021 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) |
| Jun 29, 2020 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019) |
| Dec 5, 2019 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Dec 5, 2019 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Apr 30, 2019 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 |
| Mar 27, 2018 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017) |
| Feb 16, 2017 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2016) |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jun 1, 2016 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS(2015) |
| Jun 1, 2015 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS |
| Dec 31, 2013 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN ENERGY EFFICIENCY REPORT (EER) PER AD. CODE SEC. 28-308.4 |
| Dec 31, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 |
| Aug 5, 2009 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | (27-1021A) : FAILURE TO PROVIDE SIDEWALK SHED OR SAFETY MEASURES BC.3307.31 REMEDY: PROVIDE SIDE WALK SHED OR SAFETY MEASURES WHERE REQUIRED: BADGE# 1759 |
| Aug 1, 2008 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Nov 30, 2007 | V*-DOB VIOLATION - DISMISSED | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Nov 30, 2007 | V*-DOB VIOLATION - DISMISSED | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Aug 8, 2002 | V*-DOB VIOLATION - DISMISSED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED |
| Aug 8, 2002 | V*-DOB VIOLATION - DISMISSED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 1, 1997 | V*-DOB VIOLATION - DISMISSED | LL1080-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL | LL1080-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL |