NYC Building Report

Bronx Norwood

3514 Rochambeau Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

10 records

Date Status Type Summary
Feb 19, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.EXTERIOR WALLS HAVE AREAS OF DETERIORATD MASONRY@ TOPS OF WALLS.DTERIORATD&OPEN JOISTS OBSRVD IN MULT LOCATIONS EXP1 (FRONT)WALL PARAPET@EXP 1/2 (NORTHWEST)CRNR OF BLDG LEANING INWR.1.NYS PE STRCTRL ENG IF QEWI TO IMMED EVAL ALL EXTERIOR WLLS&DSGN RPAIRS,2 FILE FOR RPAIRS BY 5/19/25,3.BTWN PRMTS&STRT
Feb 19, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN DUE TO FIRE.BLDG SFFRD A 3-ALARM FIRE ON2/14/2025 AREAS OF CHARRED FLOOR JOISTS@APT 4G&4D.LOCALLY CHARRED FRAMING@ BATHROOM OF APT 5D.MULT LARGE VENT CUTS CREATED LARGE OPENINGS.1.NYS STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR EMRGNCY ROOF RPAIRS TO LEGALIZE WRK BY 2/21/25
Feb 14, 2025 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT A HEAVY DUTY SIDEWALK SHED @ EXPO#1 MAIN ENTRANCE EXTENDING 10 FEET IN EACH DIRECTION FROM THE CENTERLINE OF THE ENTRANCE (20 LINEAR FEET TOTAL) AND EXTENDING OUT 8 FEET FROM BUILDING LINE, SHED TO BE INSTALLED IN ACCORDANCE WITH BC 3307 AND RELATED CODE PROVISION
Feb 14, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OBSERVED G AND H AND D LINES HAVE SUSTAINED FIRE, SMOKE AND WATER DAMAGE THROUGHOUT, WINDOWS OUT THROUGHOUT APARTMENTS AND NORTH SECTION OF PUBLIC HALL. JOISTS SHOW SIGNIFICANT CHARRING AND ROOF OPEN TO ELEMENTS AT MULTIPLE LOCATIONS. VACATE H, G AND D LINES. FIRE SEPARATION COMPROMISED BETWEEN APTS 3G AND 3D.
Feb 14, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OBSERVED G AND H AND D LINES HAVE SUSTAINED FIRE, SMOKE AND WATER DAMAGE THROUGHOUT, WINDOWS OUT THROUGHOUT APARTMENTS AND NORTH SECTION OF PUBLIC HALL. JOISTS SHOW SIGNIFICANT CHARRING AND ROOF OPEN TO ELEMENTS AT MULTIPLE LOCATIONS. VACATE H, G AND D LINES. FIRE SEPARATION COMPROMISED BETWEEN APTS 3G AND 3D.
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Feb 24, 2017 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Feb 7, 2000 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED