Bronx Melrose
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 22, 2026 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: PROVIDE APPROXIMATELY 165 LINEAR FEET OF SIDEWALK SHED AT EXP1 ,INCLUDE A 25 FT BY 12 FT RETURN/WING TO PROTECT THE INNER COURT AREA |
| Apr 17, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING A STRUCTURAL STABILITY REPORT. AT EXPOSURE 1, JUST ABOVE THE 6TH STORY, BRICKS ARE CRACKED, DISPLACED, LOOSE, AND OUT OF PLUMB. ADDITIONALLY, AT THE EXPOSURE 3/4 JUNCTION ABOVE THE 6TH STORY PARAPET, THE WALL IS OUT OF PLUMB, INDICATING POTENTIAL STRUCTURAL INSTABILITY. |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 9, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 17, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |