Bronx Kingsbridge-Marble Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
234 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 7, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: INSTALL APPROX 285' LINEAR FEET OF SIDEWALK SHED AT EXP#1 SOUTH ELEVATION, INSTALL APPROX 45' LINEAR FEET OF SIDEWALK SHED AT BLDG ENTRANCE ON EXPO#1 TO CONNECT WITH SIDEWALK SHED AND INSTALL APPROX 65' LINEAR FEET OF SIDEWALK SHED AT EXPO#2 WEST ELEVATION |
| Jul 27, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FACADES ELEMENT FAILURE/FAILURE TO MAINTAIN:DUE TO LARGE OPEN CRACKS OF CAVITY MASONRY WALL, VERTICAL CRACKS OF CORNER OF 2 WALLS CONNECTIN TO EACH OTHER, STEP CRACKS,DEFECT MORTAR JOINTS MULT LOCS. REMEDY: OWNER IMMED RETAIN SVCS OF NYS RDP W/QEWI CERTIFICATION. TO INSPECT & EVAL 100% ENTIRE CVAITY WALL SYS (HANDS-ON/SOUND WITH PROBE.) |
| Jul 27, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO WALL SEPARATION AND CRACKING AT EXPOSURE #1 SOUTH ELEVATION. SOUTH ELEVATION. REMEDY: IMMEDIATELY INSTALL SIDEWALK SHED AT EXPOSURE #1 SOUTH ELEVATION INCLUDING ENTRANCE UNDER DIRECTION OF LICENSED PROFESSIONAL |
| Jul 27, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS:DEFECT AT BALCONY SLAB-CEILINGS. CRACKS AT EXP1: 9 AND 12 FLOOR EAST & UPPER FLOORS. ROOF AREA:CRACK AT CHIMNEY, BULKHEAD AND SPALLING, DEFECTED WATER TOWER AT M/C ROOM. REMEDY: REPAIR AND/OR REPLACE |
| Apr 22, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE DEPARTMENT OF BUILDINGS ORDERS THAT YOU STOP ALL WORK UNDER PERMIT# 220196017 DUE TO THE APPLICANT OF RECORD WITHDRAWAL FROM THE PROJECT. |
| Apr 9, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION STEP CRACKS @ EXP 1 PARAPET LEVEL ALSO NUMEROUS CRACKS ON BALCONY CEILINGS. ROOF LEVEL OBSERVED MULTIPLE CRACKS @ BULKHEAD, STEP CRACKS & EXPOSED METAL FLASHING AT EXPOSURE #4. REMEDY: REPAIR AND REPLACE |
| Oct 10, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE AT TIME O F INSPECTION,OBSERVED AT EXP1,3 MULTIPLE BALCONIES WITH CRACKS,SPALLIN G MASONRY SHOWING REBAR.AT ROOF LEVEL OBSERVED MULTIPLE CRACKS AT BULK HEAD AND AT PARAPET WALL IN MULTIPLE LOCATIONS.OBSERVED STEP CRACKS AT EXP1 & 3.AT ROOF CMU BLOCK CRACKED.REMEDY:REPAIR AND/OR REPLACE |
| Jun 23, 2024 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) |
| Oct 4, 2023 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 4, 2023 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 4, 2023 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 28, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED MULTIPL MULTI OPENMASONRY SECT. WITH.MULTIPLE NOT SHORED.VIO.#061523SR20801CC WAS ISSUED FOR THOSE CONDITION ON 6/15/23.NEW CONDITION OBSERVED AT TODAY INSPECTION9/28/23 BROKEN WINDOW PANE AT EXPO#1 1FLOOR& EXPO#3 7TH FLOOR REMEDY:MAINTAIN BUILDING REPAIR AND OR REPLACE |
| Sep 28, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO MISSING BRICKS,CRACKS AND BROKEN WINDOW PA PANE IMMEDIATELY REPAIRS EXISTING UNSAFE CONDITIONS.REMEDY:MAKE IMMED REPAIRS UNDER SUPERVISION OF LICENSED PROFESSIONAL |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 15, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE IN A CODE COMPLIANT MANNER.OBSERVED MULTIPLE OPEN MASONRY SECTION WITH MULTIPLE NOT SHORED REMEDY:REPAIR /REPLACE DAMAGED FACADE |
| Apr 22, 2023 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) |
| Mar 22, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG EXTERIOR WALLS AND APPURTENANCES. DURING INSPECTION OBSERVED OPEN MASONRY AT EXP1. REMEDY: MAINTAIN BLDG EXTERIOR FACADE, PROVIDE APPROVED SAFETY MEASURES, REPAIR FACADE AS PER 1RCNY 103-04 |
| Aug 21, 2022 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) |
| Jun 3, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | .1)REPAIR SIDEWALK SHED 2) REINSTALL SAFETY NETTING |
| May 20, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTIAN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES VIEW AT EXP1 EAST ELEVATION MISSING BRIACKS, NORTH EAST AT WINDOW LINTELS AND DAMAGE JOINTS. BULGING AT NORTH WEST CORNER UPPER FLOOR AND SPALLING BALCONY SLAB AT EXP 1 AND 3. REMEDY: MAINTAIN BLDG EXTERIOR WALLS/FACADE AND APPURTENANCES. REPAIR FACADE |
| Jan 5, 2022 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 10, 2021 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) |
| Jun 7, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM EXTERIOR BUILDING FACADE AND APPURTENANCES. AT TIME OF INSPECTION OBSERVED DEFECTIVE FACADE. EXP 1 AND EXP 3 OBJECTS HANGING ON BALCONIES RAILING. DEFECTIVE BRICK WORK ERODED/RUSTY AC UNIT GRILL IN ALL EXPOSURE. EXP 4: INADEQUATE AC UNIT SUPPORT AT 3RD AND 8TH FLOOR REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES |
| Feb 3, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 29, 2020 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019 |
| May 5, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REPLACE LOOSE ,DEFECTIVE AND MISSING SIDEWALK SHED WOOD PARAPET PANELS |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Aug 7, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 7, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 20, 2019 | V-DOB VIOLATION - ACTIVE | EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| May 20, 2019 | V-DOB VIOLATION - ACTIVE | EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| May 20, 2019 | V-DOB VIOLATION - ACTIVE | EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| May 20, 2019 | V-DOB VIOLATION - ACTIVE | EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Mar 6, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 14, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 14, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 14, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 31, 2018 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 9, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 9, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 9, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 9, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |