Bronx Eastchester-Edenwald-Baychester
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| May 2, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING ENGINEERING REPORT DUE TO COMPROMISED RETAINING WALL. AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE # 3 RETAINING WALL WITH A LARGE STEP CRACK FROM TOP TO BOTTOM OF THE WALL(APPROX 5 FEET), ALSO CMU BLOCKS THAT HAVE SHIFTED AND BULGING OUT. |